Skip to main content
Tiling & Waterproofing

Replacing A Bath With A Shower In An Apartment

John OwenFounder5 min read

A bath can come out and a walk-in shower can go in its place in most apartment bathrooms. The real work is the part nobody sees afterwards: a new membrane, a floor waste in the right position, and a floor that falls to it.

In an apartment building it also starts with the building's sign-off, because the new membrane protects the unit below as much as the bathroom it sits in.

The building's sign-off

Removing a bath disturbs the waterproofing around it, and the new shower needs a new membrane. The owners corporation approves that kind of work before it starts, and the building manager will want the scope, the working hours and the trades. The rest of the logistics are in [bathroom work in an occupied apartment](/blog/bathroom-work-in-an-occupied-apartment).

Booking the trades before the sign-off exists is how a bathroom ends up stripped and stalled.

What sits under the old bath

A bath is a sealed tub, so the walls and floor around it were often built on the assumption that they would never get wet. In older bathrooms the wall tiles behind the bath can stop at the bath line, the membrane can be missing or run only to bath height, and the floor under the tub is often bare screed.

A shower is a different exposure. AS 3740:2021, the standard for waterproofing domestic wet areas, treats the shower area as the highest risk zone and requires the shower walls to be waterproofed to at least 1800 mm above the finished floor, or 50 mm above the shower rose if that is higher. The old bath surround rarely reaches that height, so the walls are stripped back and the membrane is done again properly.

The drain

A bath waste sits at one end of the tub at a set height. A shower needs a floor waste with the floor falling to it, and the two are rarely in the same place.

In a concrete apartment building the waste pipes run down through the slab into the ceiling space of the unit below. Moving a waste can mean cutting into the slab and working from the neighbour's ceiling, which is another reason the building signs off on the job and the unit below needs notice.

Where the waste cannot move far, a linear grate along one wall is often the answer. It lets the floor fall in one direction, which suits a narrow space where the bath used to be.

Floor level, hob or step

The floor has to fall to the waste so water never sits on the tiles. That fall needs height, and the old bath recess does not always have it.

A hobless shower keeps the floor flush from the bathroom to the shower, with the fall built into the screed. It looks clean and suits anyone who finds a step hard, and it relies on accurate falls and a screen that holds the water in.

A hob or a step-down gives a small upstand or drop at the edge of the shower that keeps water in. It is the practical answer where the slab or the waste position does not allow a flush floor.

Taps, hot water and the shower rose

The bath taps sit low on the wall, and a shower mixer sits at hand height with the rose above it. Moving them means opening the wall, running new pipe and fitting new outlets, all before the membrane goes on.

In a building with a central hot water plant, or a unit with a tempering valve under the floor, the hot water side needs checking at the same time. The reasons are in [tempering valves and hot water scalding](/blog/tempering-valves-and-hot-water-scalding).

Electrical in the room

A new layout moves the wet zone, and electrical work in a bathroom is governed by clearance zones around the shower. Downlights, a heat lamp, a heated towel rail or an exhaust fan near the new shower all need checking against those zones, and that is work for a licensed electrician before the walls are closed.

The membrane, the flood test and the tiles

The order is fixed. The membrane goes on, reinforced at every corner, junction and penetration, and it cures before anything else touches it. A flood test then holds water in the shower for a period to prove it, and only after that does a tile go down.

The reasoning behind that order is in [waterproofing you never see, the membrane under every wet area](/blog/waterproofing-you-never-see-the-membrane-under-every-wet-area).

The screen and the finish

A walk-in shower needs a screen sized to the spray. A fixed glass panel suits most layouts, and a door suits a smaller space where a panel would let water out. Silicone goes in last, at every change of plane, once the tiles and screen are set.

Why it suits one team

Plumbing, waterproofing, tiling, electrical and glazing all happen in one small room, in a fixed order, with a cure time in the middle. When each trade waits on the last, the bathroom sits unusable for every gap between them.

With one team holding the whole sequence, the bath comes out, the membrane is right before the first tile, and the room goes back into use finished.

Our tiling and waterproofing work. Talk to us about a property.

JO

John Owen

Founder

Ample Trade, every trade a property needs held by one accountable team on one contact, across the Eastern Suburbs and the Sydney CBD.

BathroomsWaterproofingShowersStrataApartments

Tell us about your building.

We will respond with a clear understanding of how we can help.

Get in Touch