You can tile over old tiles on a dry floor or wall when the old tiles are firmly stuck, flat and clean. You should not do it in a shower, or anywhere the waterproofing underneath is in doubt, because a new layer hides the very thing that needs checking.
A second layer adds height and weight. It also leaves the old layer doing all the holding, so the answer depends on the state of the old tiles and on what sits around them at the doors, the drains and the cupboards.
The tap test
Tap across the old tiles with the handle of a screwdriver, one by one. A solid tile sounds sharp, and a tile that has come away from its bed sounds hollow.
One or two hollow tiles can be cut out and the gap filled level. Once a floor has patches of them, the bond has gone and the whole lot comes up, because a new layer will lift along with the old one underneath it.
Cracks matter too. A crack that stretches across several tiles usually follows movement in the floor below, and it comes straight back through the new tile. The causes are in [tile and grout failure, what it tells you](/blog/tile-and-grout-failure-what-it-tells-you).
Where it works
A sound kitchen floor, a hallway or an entry can take a new layer, as long as the height works. A kitchen splashback is the classic case, since the wall is dry and the old tiles are usually well stuck.
Where it does not
A shower. The membrane under the tiles is what keeps water out of the room and the building. AS 3740:2021, the standard for waterproofing domestic wet areas, treats the shower as the highest risk zone, and nobody can check a membrane through two layers of tile. New tiles also do nothing for a shower that already leaks, for the reasons in [the leaking shower, why it keeps coming back](/blog/the-leaking-shower-why-it-keeps-coming-back).
A bathroom floor with any doubt. Tiles go over a properly cured membrane, never over a guess. Stained skirtings, a damp wall in the next room or a mark on the ceiling below all mean the old floor comes up.
Anywhere the falls are wrong. A floor that holds water today holds water under the new tile too. A new layer follows the same slope as the old one, and the waste now sits lower than the floor around it unless it is raised.
A balcony. Falls, the door sill and the outlet all set the height here, which makes a second layer a poor fit. The detail is in [balcony tiling and drainage](/blog/balcony-tiling-and-drainage).
The height problem
A floor tile and its adhesive add about 10 to 15 mm. That sounds small. It stops sounding small when it reaches something that cannot move.
Doors are the first thing to check, and they are often trimmed at the bottom to clear the new floor. Where the new tile stops at carpet or timber in the next room, the step needs a proper trim, which is covered in [flooring transitions and trip hazards](/blog/flooring-transitions-and-trip-hazards).
In a kitchen, the one everybody forgets is the dishwasher. Raise the floor around it and the machine can be trapped under the benchtop the next time it needs to come out. The toilet pan and the floor waste need raising too, or the room finishes with a toilet sitting in a recess.
The wall version
A second layer on a wall adds weight, and a plasterboard wall has a limit set by the sheet maker. Old tiles on a solid brick or rendered wall are a much safer base.
Power points, switches and mixer plates all sit further back once the wall comes forward. They need extending so they sit flush, which means a licensed electrician and a licensed plumber in the sequence. Where the new layer stops short of a window or a ceiling, the exposed edge needs a trim or a tile cut to hide it.
How it is done
The old surface is scrubbed and degreased, because soap film and cooking grease break the bond. Glazed tile gives adhesive very little to grip. It is scuffed back or primed with a product made for the purpose, and the adhesive is one rated for tile over tile.
High spots are ground down and low spots filled, since any lip in the old floor shows up in the new one. Movement joints in the old layer are carried through to the new layer at the same place, so the new tiles have room to move as the building does. Then comes the usual work of setting out, laying, grouting and siliconing the corners.
When stripping is the better job
Stripping makes more noise and dust on the first day, and in an apartment that has to fit inside the building's working hours. It also removes every doubt about what is underneath.
If the tiles are hollow, if the area gets wet, or if the height does not work at the door, the old layer comes up. A new tile is only as good as what it is stuck to.
The call is easier when the same team looks at the plumbing, the waterproofing and the tile together. Nobody has a reason to protect one trade's part of the job, so the floor gets whatever it actually needs.