Interwar Apartment Blocks In The Eastern Suburbs
A large share of the apartments in Potts Point, Elizabeth Bay, Bondi, Randwick and Coogee sit in brick blocks built between the two world wars. Three or four storeys, a shared stairwell, no lift, face brick outside and timber floors inside.
Many have aged well. They also carry services that were installed close to a century ago, and any trade job inside one comes up against that sooner or later.
What these buildings are made of
Brick walls, often face brick outside and rendered or plastered inside. Some walls are cavity brick and some are solid, and a solid wall behaves differently with moisture.
Timber floors on timber joists, spanning between the brick walls. The floor between units is timber rather than concrete, which matters for sound and for any wet area work.
Fibrous plaster or lath and plaster ceilings, fixed to the joists above. Ornamental cornices and ceiling roses are common in the better blocks.
Original drainage, usually cast iron or earthenware stacks running down the outside of the building or through a service shaft.
Original or early replacement water pipes, often galvanised steel, which corrodes from the inside and slowly restricts the flow.
The services that cause the most work
Water pipes. Galvanised pipe that has corroded internally shows up as low pressure, rusty water after the taps have been off for a while, and pinhole leaks inside walls.
Drainage stacks. Cast iron corrodes and earthenware joints open, so leaks and smells appear in the stairwell or in the unit below. Replacing a stack in a building like this is a planned project, described in [plumbing stack replacement in older buildings](/blog/plumbing-stack-replacement-in-older-buildings).
Wiring and switchboards. Many of these blocks have been rewired at least once, but some still have old circuits, rewireable fuses and no safety switches. Adding a dishwasher, an air conditioner or an induction cooktop can push an old supply past what it was designed for, which is the subject of [switchboard upgrades in older buildings](/blog/switchboard-upgrades-in-older-buildings).
Gas. Original gas lines are common. They feed stoves and hot water units, and they need care whenever anything around them changes, because a kitchen or laundry renovation can leave an old line in a wall nobody expected to open.
Bathrooms with no membrane
Bathrooms in interwar blocks were usually tiled over a mortar bed with no waterproofing membrane of the kind required now. Many have been renovated since, though not all of them to the current standard.
A shower that has leaked slowly into a timber floor for years can rot the joists under it. So any bathroom work in these buildings starts with checking what is under the tiles, and a renovation means a membrane installed to today's standard over a floor that may need repair first.
Ceilings
Fibrous plaster ceilings were fixed to the joists with plaster wads and ties. After decades, those fixings can weaken and the ceiling can sag between joists or, in the worst case, come down. A dip, a crack running in a straight line across the ceiling, or a section that feels loose when pressed is worth checking, and the signs are covered in [sagging ceilings and what holds them up](/blog/sagging-ceilings-and-what-holds-them-up).
Heritage controls and older materials
Many of these blocks sit inside heritage conservation areas. External changes, such as new windows, a different front door or a change to the facade, can need council consent. Internal work inside a unit usually does not, though the owners corporation by-laws still apply.
Later renovations also mean newer materials sit alongside the original ones, particularly fibre cement sheeting added in the middle of the last century. Any material that might contain asbestos is identified before it is cut, which is the process in [asbestos in older buildings and what stops a job](/blog/asbestos-in-older-buildings-and-what-stops-a-job).
Working in a walk-up
No lift means every tile, sheet of plasterboard, vanity and bag of rubbish goes up and down a shared stairwell. The timber floors carry sound to the unit below, and turning off the water can affect several units at once.
So the job is planned around the building: protection for the stairwell, notice to neighbours, deliveries timed around residents, and an isolation plan agreed with the building before the work starts.
Why it suits one team
A small job in an interwar block rarely stays small. A leaking shower leads to a rotten joist, which leads to a ceiling repair in the unit below. A new dishwasher leads to a switchboard upgrade, and a new vanity uncovers galvanised pipe that should be replaced while the wall is open.
None of that is unusual. One team that reads the building from every angle can plan for all of it before the first tile comes off.