Hybrid And Vinyl Plank Flooring In A Rental
Hybrid and vinyl plank flooring have become the usual choice for a rental refresh, and for good reason. They look like timber, handle water on the surface far better than timber does, and stand up to the wear of one tenancy after another.
They are not foolproof, though. Most of the failures we see come from what happened before the planks went down rather than from the planks themselves.
What the two products are
Vinyl plank is a flexible plank, either glued to the floor or made to click together. It is thin, quiet underfoot when glued, and very forgiving of moisture on the surface.
Hybrid is a rigid plank with a stiff core, a printed layer and a wear layer on top, clicked together and laid as a floating floor over an underlay. It feels more solid underfoot, bridges small imperfections in the subfloor a little better, and is the common choice where carpet or old timber is being replaced.
Both are often sold as waterproof. That describes the plank, not the floor, because water that gets through the joints or around the edges can still sit on the slab or timber underneath.
The subfloor decides the result
A floating floor follows whatever is under it. A slab with a hump or a dip, or a timber floor with a loose board, shows up as planks that flex, joints that open, or a hollow sound in one spot.
So the floor is checked for flatness first, and high spots are ground down or low spots levelled before any plank goes down. Manufacturers set a flatness tolerance, and their warranty depends on it.
Moisture matters too. A ground floor slab with damp coming up through it, the problem described in [damp in basements and ground floor walls](/blog/damp-in-basements-and-ground-floor-walls), needs a moisture barrier, or the underlay and the planks will suffer.
Strata rules on hard floors
Replacing carpet with a hard floor in an apartment changes how much sound reaches the unit below. Many owners corporations have by-laws that require approval before the change and an acoustic underlay rated to a stated level.
Laying a hard floor without checking can end with a noise complaint and an order to take it up. The by-laws and the approval come first, and the underlay is chosen to suit them.
Expansion gaps and edges
Floating floors move with temperature. They need a gap at every wall, at door frames and around fixed objects like a kitchen island, hidden under the skirting or a trim.
A floor laid tight to the walls has nowhere to go on a hot day, so it lifts or peaks at the joints. A long run laid without a break can do the same, which is where a transition strip goes. Those transitions also need to sit flat at door thresholds, and the detail is in [flooring transitions and trip hazards](/blog/flooring-transitions-and-trip-hazards).
Doors, skirtings and the trades around the floor
A new floor usually sits higher than the carpet it replaced, so doors may need trimming to clear it. Skirtings may come off and go back on, or be replaced if they split coming off. Architraves get undercut so the planks slide underneath for a clean edge.
That is carpentry and painting attached to a flooring job, and it is the reason a floor quote from a single trade often grows once the work starts.
Wet areas
Hybrid in a kitchen or laundry is common and works well with care around the sink and the dishwasher. Hybrid in a bathroom is a different decision, because water on a bathroom floor is a daily event and the edges and joints will see it every day. Tiles over a membrane remain the standard answer for a wet area.
For a rental
The case for hybrid or vinyl in a rental is strong. The wear layer resists scratching, the floor cleans easily, there is no sanding or recoating between tenancies, and a damaged plank can often be replaced on its own.
Keeping a box of spare planks from the same batch is the single most useful thing an owner can do, because colours shift between batches and a matching plank can be hard to find a few years later.
Where an existing timber floor is in good condition, sanding it can still be the better choice, and the reasoning is in [timber floors, sand or replace](/blog/timber-floors-sand-or-replace).
As part of a refresh
A new floor is usually one part of getting a property ready between tenants, alongside paint and wet area work. The order matters. Walls and ceilings are painted before the floor goes down so the new surface is not marked, and the doors are trimmed and the skirtings refitted and touched up after.
With one team sequencing it, the floor goes down once, the doors close, and the property is ready to list. The wider version of that sequence is [the finish a tenant sees first, paint and flooring between tenancies](/blog/the-finish-a-tenant-sees-first-paint-and-flooring-between-tenancies).
Related Articles
Tell us about your building.
We will respond with a clear understanding of how we can help.
Get in Touch