What An Apartment Refresh Renovation Covers

John OwenFounder4 min read

An apartment refresh renovation replaces what a tenant sees and touches, from the vanities, toilets and fixtures to the paint and flooring, as one job under one price. The layout stays where it is, which makes it the step between a repaint and a full renovation.

It suits a sound apartment that has gone tired over a few tenancies. For an agent, it brings that unit back to the market as one decision.

What a refresh usually includes

The bathroom. New vanity, toilet suite, tapware and shower screen, with fresh grout and silicone. The wet area is reworked where it needs it. Whether a bathroom can stay at this level comes down to the membrane, as set out in [bathroom refresh or full renovation for a rental](/blog/bathroom-refresh-or-full-renovation-for-a-rental).

The kitchen. New doors, handles, benchtop, tapware and lighting, on cabinets that are still sound. The check and the order are in [rental kitchen refresh without a full renovation](/blog/rental-kitchen-refresh-without-a-full-renovation).

Electrical. New light fittings, extra power points where the unit needs them, smoke alarms checked, and a check of the switchboard before any new circuit goes in.

Doors and timber. Doors that close and latch, new hardware, damaged skirting and architraves matched to what is already there.

Paint and flooring. A full repaint, then new carpet or timber, laid last.

What it leaves alone

A refresh keeps the walls, the wet areas and the kitchen where they are. Move the sink to another wall, take out a partition or shift a shower, and new drainage and power lines turn the job into a renovation.

The walkthrough

The scope is set by walking the unit before anything is ordered. That walk answers the questions that change the job:

  • Is the membrane holding, with no staining in the ceiling below or damp in the next room?
  • Are the kitchen cabinet boxes solid, or swollen under the sink?
  • Do the floors need levelling or screwing down before the new surface goes on?
  • Can the switchboard take any added circuits?
  • Are there older materials, such as asbestos sheeting or lead paint, that a job would disturb?

The answers become one list of works, and that list gets one price. If a vanity comes out and shows a wet wall, the agent and owner see the photos before the job goes any further.

The order

The order decides how a refresh goes. Each trade either protects the next one or damages its work, and most of the rework on a turnover comes from someone arriving before the room was ready for them.

Strip-out. Water and power are isolated, then the vanities, toilets and fixtures come out along with the old floor coverings.

First fix. New plumbing and electrical points go in while the walls are open, along with any waterproofing in scope.

Wet area. Tiles go down only over a cured membrane, never the reverse.

Repairs and carpentry. Doors, cabinetry, plaster and trim are finished while dust is still allowed in the room.

Paint. Once the dust-making work is done, the walls, ceilings and trim get painted.

Fit-off. Every fixture is connected and every light, tap and power point is tested.

Flooring. New floors go in last, as set out in [new carpet in a rental between tenancies](/blog/new-carpet-in-a-rental-between-tenancies).

Run out of order, the same work gets done twice. A painter who arrives before the cabinet work repaints the same wall, and a floor laid early collects paint and boot marks before anyone has seen it.

Timing

A vacant unit is rent the owner does not receive, so the refresh is booked before the lease ends rather than after the keys come back. Materials such as tiles, vanities and benchtops are ordered from the list of works, which means the team is not waiting on a delivery while the unit sits empty.

Most of the delay on a turnover sits in the gaps between trades, which is the point of [getting an end-of-lease unit re-let-ready](/blog/end-of-lease-made-re-let-ready-fast).

In an apartment building

The building's rules shape the plan. The lift gets booked and protected, rubbish leaves on an agreed route, noisy work happens inside set hours, and any work touching the waterproofing needs the owners corporation's sign-off before it starts. Getting that sorted early keeps a stripped bathroom from sitting idle while paperwork catches up.

What the agent gets

One contact from the walkthrough to the handover, and one price for the whole list. The agent gets the keys back with a unit ready for the listing photos and no trades left to chase.

An owner who has seen that work once tends to hand over the next one with less discussion, and that is how a single refresh becomes the way a whole portfolio gets turned around.

Our maintenance work. Talk to us about a property.

JO

John Owen

Founder

Ample Trade, every trade a property needs held by one accountable team on one contact, across the Eastern Suburbs and the Sydney CBD.

RefreshRentalsRe-letApartmentsEvery Trade

Tell us about your building.

We will respond with a clear understanding of how we can help.

Get in Touch