Replacing a vanity is one of the quickest ways to make a tired bathroom look current, and it is one of the most common parts of a refresh between tenancies.

It looks like a plumbing job. In practice it is rarely only that, because the old vanity has usually been hiding something for years.

What sits behind the old unit

Pull out a vanity that has been in place for fifteen or twenty years and the wall behind it tells the story of the bathroom.

Tiles that stop short. Floor-standing vanities were often installed first and tiled around, so there may be no tiles at all behind or under the old cabinet. A new unit with a different footprint, or a wall-hung design, exposes bare floor and wall.

Water damage at the base. A slow leak from a waste or a tap connection soaks the bottom of the cabinet and the floor under it, and it can run for years without anybody noticing because the cabinet hides it.

Old fittings that will not survive the change. Corroded isolation valves, flexible hoses past their life, and a waste set at a height that suits the old basin rather than the new one.

Which is why the honest scope for a vanity swap is set once the old unit comes out, not before.

Floor-standing or wall-hung

Floor-standing units are the simpler swap when the footprint matches, and they hide the pipework at the back. They also sit on the part of the floor that gets wet, so the base needs to be sealed properly or the board swells.

Wall-hung units look lighter and make the floor easier to clean, which suits a rental. They need solid fixing into studs or masonry, because a basin full of water with a person leaning on it is a real load. In a stud wall that can mean adding timber noggings, which means opening the wall.

That choice changes the trades involved. A like-for-like floor-standing swap can be plumbing and silicone, while a change to wall-hung can bring in carpentry, sheeting, tiling and waterproofing as well, all before the new unit is hung.

The plumbing part

Plumbing work in NSW has to be done by a licensed plumber, and a vanity change involves several connections.

Isolation valves at each supply, so the vanity can be serviced later without turning off water to the whole unit. In an apartment this matters more, because the alternative may be isolating part of the building, as covered in [isolation valves and why a building needs them](/blog/isolation-valves-and-why-a-building-needs-them).

New flexible hoses, because reusing old ones under a new vanity is how a flood starts.

The waste and trap set to suit the new basin, so it drains properly and holds its water seal.

Taps or a mixer matched to the basin, with the tap holes and the mixer style decided before anything is ordered.

Waterproofing and tiling

Where the old vanity covered bare floor or wall, the gap has to be closed properly rather than filled with silicone.

In a wet area that means the membrane has to be continuous where the standard requires it, then tiled, which is the work in [waterproofing you never see, the membrane under every wet area](/blog/waterproofing-you-never-see-the-membrane-under-every-wet-area). Matching old tiles is often the hardest part of the job. A close match from stock, a feature panel, or a tiled splashback that covers the change are the usual answers.

Silicone and the finish

The joint between the vanity top and the wall, and around the base of a floor-standing unit, is sealed with a flexible sealant. Done well, it keeps water out of the cabinet and the wall for years. Done badly, it is the reason the next vanity gets pulled out early, and the timing is in [silicone joints and when they need replacing](/blog/silicone-joints-and-when-they-need-replacing).

The electrical part

Many vanities now come with a mirror cabinet that has lighting, a demister or a power point inside. Those need power run to the right position, and electrical work in a bathroom is governed by clearance zones around the basin, the bath and the shower.

That is licensed electrical work. Plan it before the wall is closed and tiled, not after the mirror cabinet arrives.

In an occupied apartment

A vanity swap in an occupied unit means the bathroom is out of use for part of the job, water may be off for a period, and some dust and noise come with it. Notice, timing and building rules all apply, which is the logistics set out in [bathroom work in an occupied apartment](/blog/bathroom-work-in-an-occupied-apartment).

Why it suits one team

A vanity change can touch plumbing, carpentry, waterproofing, tiling, silicone and electrical in one small room. Each has to happen in order. The room cannot be used until the last one is finished, so every day lost between trades is a day the bathroom sits out of action.

With one team sequencing the whole job, the old unit comes out, whatever it was hiding is dealt with properly, and the bathroom goes back into use finished.

Our plumbing work. Talk to us about a property.

JO

John Owen

Founder

Ample Trade, every trade a property needs held by one accountable team on one contact, across the Eastern Suburbs and the Sydney CBD.