Maintenance In A Tenanted CBD Office Building
Maintenance in a tenanted CBD office building is planned around access windows. The fault list is mostly lights, bathrooms, kitchenettes, doors, ceilings and finishes, and the work is planned around working hours, the building's rules and each tenant's own security.
For a facilities manager, the trade work itself is seldom the hard part. The hard part is the number of people who have to agree on when it happens, and that is where sending the whole list to one contact pays off.
The usual fault list
Lights. Panels in a grid ceiling fail one at a time, and a floor with a mix of old and new fittings looks patchy. Replacing them in batches, with the same colour of light, keeps the floor even.
Ceiling tiles. A stained tile in a suspended ceiling is often the first sign of a leak from above or a dripping air conditioning line. Swapping the tile without looking above it means the stain returns.
Bathrooms. Cisterns, sensor taps, soap and hand dryer fittings, door locks and partition hardware all get heavy daily use. A shared bathroom out of action on one floor sends people to the next, and the complaint reaches the manager quickly.
Kitchenettes. Mixer taps, boiling water units, dishwashers and the cupboard hardware around them. These are small jobs on their own and a steady stream across a building.
Doors and hardware. Closers, latches, access-controlled doors and glass doors that no longer line up. Fire doors on the stairs are part of this list, and they have to close and latch every time.
Carpet tiles and paint. Stained or worn tiles are swapped from spare stock, and scuffed corridors are painted to the original colour. Keeping spare carpet tiles from the same batch is what makes the patch disappear.
What stays off the list
Lifts, the fire panel and central air conditioning plant usually sit under their own specialist service contracts. The trade list works around them, and a fault that crosses into one of those systems gets raised with whoever holds the contract, with photos of what was found.
Tenancy or base building
Who pays for a fault depends on the lease, and the line differs from one tenant to the next. A light inside a tenancy can belong to the tenant in one lease and the landlord in another.
The practical answer is simple paperwork. Each item on the list carries its floor and tenancy, and the invoice is split the same way, so the manager does not have to pull a combined bill apart at the end of the month.
Access and the building's rules
A tower has a process for everything, and working with it keeps the job on time. Contractors are inducted, insurance certificates are on file, the loading dock has a slot and the goods lift is booked. Passes are signed out and signed back in.
A tenant with sensitive work, such as a legal or financial office, will have rules about who is on the floor and when, and an escort is often part of the arrangement. Staying off desks, leaving papers alone and keeping phones in pockets is simply part of working on that floor.
Noise and dust
Drilling at nine in the morning next to a meeting room is a sure way to lose a tenant's goodwill. The noisy work is scheduled before hours, after hours or on a weekend, inside what the building allows, and the rest is explained in [after hours work and noise restrictions](/blog/after-hours-work-and-noise-restrictions).
Lifting a ceiling tile also drops years of dust onto whatever is underneath. Desks are sheeted first, or the work is done overnight with the area cleaned before staff arrive. A wet floor or a smell of paint at 8am undoes the good of the job, so paint goes on with enough time to clear.
The safety items
Emergency lights and exit signs are tested on a schedule, and they are easy to overlook when the rest of a floor is working normally. The system is explained in [emergency lighting and exit signs](/blog/emergency-lighting-and-exit-signs).
Any cable or fitting work on an occupied floor is licensed electrical work, tested before the floor goes back into use.
The reporting
An office building produces a lot of small jobs, and a manager needs to show a tenant that each one was closed. A short photo report for each item, sorted by floor and tenancy, answers that without a meeting. The reasoning is in [the photo report and why it settles arguments](/blog/the-photo-report-and-why-it-settles-arguments).
One list for the building
Booking a separate trade for each line means separate inductions, separate insurance checks and separate bookings for the same goods lift. One team learns the building once, and it can move from a light to a tap to a door on the same night.
That is the same reasoning as [one contact for the whole building, the case for consolidation](/blog/one-contact-for-the-whole-building-the-case-for-consolidation). The manager looks after the building, and the trade list stops being a second job. See our maintenance in the Sydney CBD.
How we work with building managers. Talk to us about a property.
Related Articles
Tell us about your building.
We will respond with a clear understanding of how we can help.
Get in Touch